The body work with this S14 is almost finished. The rust have been removed and the safety cage is fitted in. The entire body has been re-welded. The project is coming to the point where we "only" need to put all the components to their places... ;)
The body was quite rusty, it took quite a lot of time catching and killing all the rusts:
So much sofar, next update soon ;)
We just have a Nissan S14a rolled into our workshops. DRIFTER.LT garage is going to make this S14a into new car. Lots of modifications, lots of new things, safety ofcourse - rollcage, engine boost-up.... A nice project is waiting.. The start as always is taking everything out, removing unnecessary parts, cleaning the interior of sound isolation material...

So we have some action with S14a. We have already cleaned the ineterior and bottom. The spare tire place was cut off, also the old seat mounts were cut out to lower the seat.
Lots of rust - lots of time wasted on fighting with it...